We have the experience and expertise
Our experience includes small and large underground mining projects covering various mining methods. Our team is proficient with mining methods like narrow vein drift and fill, room and pillar, cut and fill, transverse and longitudinal stoping, block caving, sub-level caving, and inclined caving.
Project Distribution by Geography
-
USA
View USA ProjectsUSA Projects
Molybdenum mine, Colorado, 2018: General operational support for an operational block caving Molybdenum mine. Responsibilities included long term mine planning and scheduling for new panel expansion, and drill & blast design for block caving.
Copper mine, Arizona, 2017: Feasibility level design of underground mine ventilation, surface refrigeration plant and underground air cooling systems for shaft deepening of a deep and hot block caving copper mine.
Gold mine, Nevada, 2017: Scoping study on the expansion of an existing 1,700 tonnes per day gold mine using block caving and sub level caving mining methods.
Nickel mine, Michigan, 2016: Detailed design of the expansion of existing Eagle underground Nickel mine to Eagle East deposit. Through underground mine surveys, designed main and auxiliary ventilation to take the mine expansion. Designed mine services including mine dewatering system for the development and operation of Eagle East.
Copper – Silver mine, Montana, 2015: Prefeasibility study of a 3,300 tonnes per day cut & fill copper-silver mine, including mine planning, design, scheduling, material handling trade off studies, ventilation and cost estimation.
Copper – Nickel – PGM mine, Minnesota, 2014: Prefeasibility study of a 50,000 tonnes per day underground copper-nickel-PGM mine.
Copper – Gold – Silver mine, Utah, 2013: Scoping study of the underground expansion of an existing open pit copper-gold-silver mine, using block caving and stoping mining methods.
Gold mine, Nevada, 2013: Underground expansion of an operating gold mine using stoping methods.
Copper – Silver mine, Montana, 2012: Scoping study of a 1,500 tonnes per day copper-silver mine using longhole stoping/ overhand cut & fill mining methods.
Gold mine, Nevada, 2011: Underground expansion of an existing gold mine including shaft construction and mine airflow reversal. Liaison between owner and subcontractors, overseeing mine ventilation and air heating system design.
-
Canada
View Canada ProjectsCanada Projects
Gold mine, Ontario, 2019: Feasibility level mine planning, mine design, ventilation design, and air heating system design for the expansion of an existing gold mine with a production capacity of 800 tonnes per day using cut & fill and long hole stoping.
Zinc mine, British Columbia, 2018: Scoping level ventilation design and mine air heating system design for a 4,000 tonnes per day stoping Zinc mine.
Zinc – Lead – Silver mines, Yukon, 2018: Scoping level study of two underground stoping Zinc-Lead-Silver mines at a combined production rate of 5,000 tonnes per day. Each mine is planned to produce about 3,500 tonnes per day at their peak. Responsible for mine ventilation design and mine air heating systems design.
Gold – Silver mine, British Columbia, 2016: Detailed study of ventilation system, including peer review of the airflow requirement estimation from previous feasibility study and feasibility study updates of a 2,700 tonnes per day longhole stoping gold-silver mine.
Nickel – Copper mines, Newfoundland and Labrador, 2014: Responsible for FEL3 level ventilation design and mine air heating design of two separate underground nickel-copper mines. One mine used drift & fill, post pillar cut & fill, and longhole stoping mining methods to produce at a rate of about 2,700 tonnes per day. The other mine used longhole stoping to produce at a rate of 4,500 tonnes per day.
-
Latin America
View Latin America ProjectsSouth America Projects
Copper mine, Guatemala, 2019: Scoping level economic evaluation of a group of ore deposits for block caving and sublevel caving, and feasibility level design of ventilation and cooling system for an underground mine with super-heated ground water issues.
Gold mine, Guyana, 2017-2019: Scoping level and feasibility level study of underground expansion of an operating 8,000tonnes per day open pit gold mine. Was part of strategic planning, life of mine (LOM) planning, mine design, scheduling, ven tilation and dewatering infrastructure design, and cost estimation.
Siver mine, Mexico, 2018: Mine planning, design of ventilation, dewatering, compressed air and power distribution systems for the expansion of a 2,500 tonnes per day underground silver mine.
Gold – Silver mine, Mexico, 2017: Ventilation design for decline development of a proposed underground gold-silver mine.
Copper mine, Peru, 2015: Scoping study of a 5,700 tpd sublevel stoping and cut & fill mine. Was part of mine planning, design, scheduling and ventilation system design.
Gold mine, Uruguay, 2014: Feasibility level mine design and ventilation design for the expansion of an existing underground stoping mine.
Gold – Silver – Copper mine, Mexico, 2013: Exploration access study for two underground gold-silver-copper deposits.